Pasargad Onshore Drilling Rig 21
The Pasargad 21 onshore drilling rig, originally constructed in 2012, underwent a complete overhaul in 2024. Its Draw Works system provides 2,000 horsepower, enabling a drilling capacity of 7,000 meters with a 4½-inch drill pipe and a maximum load capacity of 4,500 kN. This rig is also active in the Sepehr and Jofair oil fields.