Our Projects

 

Project for increasing production capacity of South Pars Field (POGC)
 

Project for increasing production capacity of South Pars Field (POGC)

Sunday، 27 June 2021 | Article Rating

Project for increasing production capacity of South Pars Field (POGC)

• Contract No.: 956-96-35 

• Employer: Pars Oil and Gas Company 

• Project site: phases 2-5 of Yalda exploration field 

• Date contract signed: 22.05.2018 

• Date started: 27.05.2018  

• Contract term: 3 years 

• Contract scope: Repairing wells of phase 4 (Spd5 operational area), completion, repair and increase the production capacity in wells of phase 13 (13     Cand 13 B) and drilling, technical, support and logistics services of well No. 02 at Yalda exploration field

Project services:

• Providing offshore drilling rig, logistics and passenger support vessels, support helicopters and 15 technical and ancillary services in maritime operations

• Given the daily costs of drilling operation and ancillary services and the issue of cost controlling, management and coordination of logistic and    support  services in offshore drilling projects are quite important. Pezhvak Energy Engineering& Services Co. (PECO) has been assigned to the    financial and statements management, goods supply, and warehousing, technical, and engineering services and logistic and support operations related to the project subject  matter of the contract No.: 956-96-35.    

Photos
  • Project for increasing production capacity of South Pars Field (POGC)
Rating
Sharing

Pezhvak Energy

Mirdamad Contact Information: No 12, Roozname Etelaat St., Mirdamad Blvd

Tel : (+9821) 91075555 Fax : (+9821) 41425555 (Internal Number: 29991)

Postal code Mirdamad: 1549957111 Email: Info@pe-co.ir

EliaWebsite

All rights of this website belong to PECO

دی ان ان