Siahmakan Field Development Project
(Bushehr)
• Contract No.: 53-73-9128
• Main employer: National Iranian South Oil Company
• Employer: Pasargad Energy Development Company
• Project site: 10 km from South Bibih Hakimeh and west of Kilvar Karim Field
• Date contract signed: 02.05.2020
• Date started: 06.06.2020
• Contract term: 2 years
• Contract scope: EPD- EPC
Project services:
Under ground:
Drilling 4 new vertical wells within Bangestan group with 5000 m in depth
Overland:
- Detailed designing, implementing and operationalizing the oil separation and pressure increasing unit to a capacity of 10 thousand barrels per day
- Implementing 12-inch underground gas pipeline with an approximate length of 16.623 km from the new Siahmakan oil separation and pressure increasing unit to Bibi Hakimeh 2 pressure increasing unit
- Implementing an 8-inch overland gas pipeline with an approximate length of 3 km from the New Siahmakan oil separation and pressure increasing unit and connection to the output 8-inch pipeline from Siahmakan manifold together with all required ancillary and strategic installations
- Construction of 13.5 km transmission line of 66 kW single metal circuit power supply with outdoor substation for supplying electricity to the oil separation and pressure increasing unit of Siahmakan
- Connecting the existing 2, 3, 4 and 5 wells of Siahmakan to the new Siahmakan oil separation and pressure increasing unit
EPD-EPC Project Scope:
Underground construction section:
- Detailed design and implementation and construction of 012 and 014 wells
- Detailed design and construction and operationalizing 001 and 030 wells
- Construction of pipelines for flows from drilling wells 001,030,012 and 014 to new oil separation and pressure increasing unit of Siahmakan with a total length of 12.4 km